Author:
Tang Yunying,Liu Fukun,Wang Xiaojie,Wei Wei,Zhang Liyuan,Xu Handong,Wu Dajun,Xu Weiye,Wang Jian
Abstract
The Electron Cyclotron Resonance Heating (ECRH) system of China Fusion Engineering Test Reactor (CFETR) is designed to inject 20 MW RF power into the plasma for heating and current drive (H&CD) applications. The ECRH system consists of 20 gyrotrons, the associated power supplies, the transmission lines and one launcher. In order to compare the launcher performance from equatorial and upper ports, two types of launcher are designed in this paper. In equatorial launcher (EL), twenty in-vessel transmission lines are divided into four groups. Every five gaussian beams from in-vessel transmission lines face one fixed focusing mirror and one steering mirror. All gaussian beams are injected into the plasma with optimal toroidal and poloidal angles calculated by C3PO/LUKE code. In upper launcher (UL), twenty-one transmission lines are supposed and divides into three groups. Every seven gaussian beams are injected into one fixed focusing mirrors and all twenty-one beams reflected to one common steering mirror finally. The optical transmission characteristics and the convergence information of gaussian beams are checked and optimized. The EL or UL is installed on the equatorial or upper port with a port-plug modular structure.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献