1. Aït Abderrahim H., De Bruyn D. et al., MYRRHA Project – Technical Description, SCK•CEN Report reference AND/HAA/DDB/3900.B043000/85/07-17bis, April 2007
2. EU Integrated Project EUROTRANS, contract nr. FI6W-CT-2004-516520
3. De Bruyn D., Larmignat S., Woaye Hune A., Mansani L., Rimpault G. and Artioli C., Accelerator Driven Systems for Transmutation: Main Design Achievements of the XT-ADS and EFIT systems within the FP6 IP-EUROTRANS Integrated Project, International Congress on Advances in Nuclear Power Plants (ICAPP'10), San Diego (California, USA), June 13–17, 2010, American Nuclear Society (2010)
4. De Bruyn D., Baeten P., Larmignat S., Woaye Hune A. and Mansani L., “The FP7 Central Design Team Project: Towards a fast-spectrum transmutation experimental facility”, International Congress on Advances in Nuclear Power Plants (ICAPP'10), San Diego (California, USA), June 13–17, 2010, American Nuclear Society (2010)