Author:
Sarkar Sumon,Giri Bibhas Chandra,Sarkar Ashis Kumar
Abstract
The paper studies an integrated vendor–buyer model with shortages under stochastic lead time which is assumed to be variable but depends on the buyer’s order size and the vendor’s production rate. The replenishment lead time and the market demand uncertainty are assumed to be reduced by changing the regular production rate of the vendor at the risk of paying additional cost. Shortages are partially backlogged and the backlogging rate depends on the length of the buyer’s replenishment lead time. The proposed model is formulated to obtain the net present value (NPV) of the expected total cost of the integrated system through optimization of (i) the buyer’s order quantity, (2) the buyer’s safety factor, and (3) the vendor’s production rate. Theoretical results are derived to demonstrate the existence and uniqueness of the optimal solution. Through extensive numerical study, some valuable managerial insights are obtained.
Subject
Management Science and Operations Research,Computer Science Applications,Theoretical Computer Science
Cited by
16 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献