Author:
Tadei R.,Della Croce F.,Menga G.
Subject
Management Science and Operations Research,Computer Science Applications,Theoretical Computer Science
Reference25 articles.
1. 1. ADAMS J., BALAS E. and ZAWACK D., The shifting bottleneck procedure for job shop scheduling, Management Science, 1988, 34, pp. 391-401.9387710637.90051
2. 2. CARLIER J., The one-machine sequencing problem, European Journal of Operational Research, 1982, 11, pp. 42-47.6717980482.90045
3. 3. CHU C., A Branch-And-Bound algorithm to minimize Total Tardiness with Different Release Dates, Naval Research Logistics, 1992, 39, pp. 265-283.11788590762.90035
4. 4. DELLA CROCE F., MENGA G., TADEI R., CAVALOTTO M. and PETRI L., Cellular control of manufacturing Systems, European Journal of Operational Research, 1993, 69, pp. 498-509.0784.90034
5. 5. DELLA CROCE F., TADEI R. and VOLTA G., A genetic algorithm for the job shop problem, to appear on Computers and Operations Research, 1994, 8.0816.90081
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献