1. Papillon B., Gagne J.-L., Giroux S., Sabourin M.,Turbine rehabilitation: Chute-des-Passes case study( HydroVision, Portland, Oregon, 2002)
2. Sallaberger M., Michaud Ch., Born H., Winkler St., Peron M.,Design and manufacturing of Francis Runners for Rehabilitation Projects( Hydro 2001, Riva del Garda, 2001)
3. Swiderski J., Martin J.,High Power Francis runner – upgrade with a new design runner, Norcan Hydraulic Turbine Inc. Report, 1999
4. Coupled Multipoint Shape Optimization of Runner and Draft Tube of Hydraulic Turbines