Author:
Allahverdi Muberra,Allahverdi Ali
Abstract
The four-machine flowshop scheduling problem is investigated with the objective of minimizing total completion time. Job processing times are uncertain where only the lower and upper bounds are known. This problem is common in some manufacturing environments. Some mathematical (dominance) relations are established, and an algorithm (with ten scenarios) is proposed. The proposed algorithm converts the four-machine problem to a single machine problem for which an optimal solution is known for the deterministic problem. The difference among the scenarios is related to the weights assigned to the lower and upper bounds of processing times on the machines. The proposed algorithm is further improved by the established mathematical relations and are evaluated based on extensive computational experiments. The computational results indicate that three scenarios of the proposed algorithm perform much better than the others, and the errors of these three scenarios get better as the size of the problem increases. The results are statistically verified by constructing the confidence intervals.
Subject
Management Science and Operations Research,Computer Science Applications,Theoretical Computer Science
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献