Author:
Tengku Mohd Tengku Amran,Jaafar Mohd Zaidi,Ali Rasol Azad Anugerah,Hamid Mohd Fauzi
Reference60 articles.
1. Chalaturnyk R. and Moffatt T. (1995). Permanent instrumentation for production optimization and reservoir management. Paper SPE 30274-MS proceedings of the SPE International Heavy Oil Symposium, Calgary, Alberta, 19-21 June.
2. Wu Z., Alpak F. O. and Torres-Verdin C. (2003). A quantitative study to assess the value of pressure data acquired with in-situ permanent sensors in complex 3D reservoir models subject to two-phase fluid flow. Paper SPE 84375-MS proceedings of the SPE Annual Technical Conference and Exhibition, Denver, Colorado, 5-8 October.
3. Silva M. I. and Kato E. T. (2004). Reservoir management optimization using permanent downhole gauge data. Paper SPE 90973-MS proceedings of the SPE Annual Technical Conference and Exhibition, Houston, Texas, 26-29 September.
4. Brinsden M. S. (2005). A New Wireless Solution to Real Time Reservoir Surveillance. Presented at the SPE Middle East Oil and Gas Show and Conference, Manama, Bahrain, 12-15 March. SPE-93512-MS.
5. Jackson M. D., Saunders J. H., and Addiego-Guevara E. A. (2005). Development and Application of New Downhole Technology to Detect Water Encroachment toward Intelligent Wells. Paper SPE 97063 presented at the SPE Annual Technical Conference and Exhibition, Dallas, 9–12 October.
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献