Author:
Topchiy Dmitry,Tokarskiy Andrey
Abstract
The article describes the significance of the Developer’s (Technical Customer) construction compliance control mechanism as an effective tool of reducing potential risks in investment and construction projects. It contains a general description of the practice of attracting organizations to conduct construction monitoring, a need for an integrated, systematic approach to the process of work acceptance. The proposed scheme of the comprehensive verification control including the laboratory validation of the Contractor’s data for the purpose of optimization and improvement of control functions was analysed using existing statistical methods. There have been indicated ways of determining qualitative and quantitative characteristics of the sample (verification control) from the universe common array (the source control of the Contractor) in compliance with the representativeness terms.
Reference23 articles.
1. Lapidus A..,
I Abramov, Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects, A. Lapidus, I. Abramov, E3S Web of Conferences, No. 33. (2018)
2. Lapidus А., Makarov A., Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects, А. Lapidus, А. Makarov, MATEC Web Conf. No. 86. (2016)
3. Oleinik P., Method for creating a work management plan of a construction company, Oleinik P., International Journal of Construction Management. No. 7. (2017)
4. Oleinik P.. Methods of erection of high-rise buildings, Oleinik P., E3S Web of Conferences, No. 33. (2018)
5. Sinenko S., Slavina A., Performance indices of project companies virtual divisions in the construction in CAD conditions, S. Sinenko, A. Slavina, MATEC Web Conf., No. 106. (2017)