Job shop scheduling considering material handling process

Author:

Pakpahan Eka K.A.,Kristina Sonna,Setiawan Ari,Merlians Evelin

Abstract

This paper discussed job shop scheduling considering material handling process. This process is a very important aspect on a flexible manufacturing system, where raw material or semi-finished goods are delivered from one processing point unto another by utilizing automated material handling equipment, functioned as shared resources. The starting time of each process is affected by the ability of the material handling equipment to conduct timely delivery from one point to another, therefore considering this process unto scheduling is important to enable planner to get precise estimation of the process makespan. We take the case where the flexible manufacturing system is consisted of four identical machines; each has the capability of processing various jobs due to the various cutting tools installed on their tools magazine. Jobs are dispatched based on longest processing time rule and then allocated to machine which has minimum load. Being a shared resource, material handling equipment has pick-up and delivery priority rule when handling multiple requests. The two most common rules are longest waiting and closest entity. This paper will analyzed the impact of each rule to the process makespan and material handling equipment utilization. Simulation model were built using Promodel to give decision maker better visualization of the system under consideration.

Publisher

EDP Sciences

Subject

General Medicine

Reference10 articles.

1. Setiawan A., Asia Pacific Industrial Engineering & Management Systems Conference (2015).

2. Setiawan A., Susan and Pakpahan E., Jurnal Telematika Institut Teknologi HarapanBangsa 9 (2014)

3. Surya T., Laporan Tugas Akhir Teknik Industri Institut Teknologi Harapan Bangsa (2016)

4. Wahyudi K, Laporan Tugas Akhir Teknik Industri Institut Teknologi Harapan Bangsa (2016)

5. Chandra A., Laporan Tugas Akhir Teknik Industri, Institut Teknologi Harapan Bangsa (2016)

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3