Hery Kristiyanto,Andreas Triwiyono,Muslikh ,Ashar Saputra
Abstract
The use of precast concrete is known to improve productivity, quality control, and cost efficiency in reinforced concrete structure. The Connection is the most important aspect of precast concrete structures. The connection transfers force between the precast components, determine strength, stiffness, and ductility of the whole structure. Providing joint in the beam-column connection region always cause difficulties during the erection stage. Relocation of the connection at a certain distance from the column to the beam span is an alternative solution that creates the beam-to-beam connection. It will be much easier to assemble the connection that consists of some joints. Research and application of the precast concrete beam-to-beam connection details have published since 1975. This paper reviews the state of the art of research and practical application of beam-to-beam connection system related to connection models, joint locations, and details. It concluded from the review that the developing research leads to improve the performance of earthquake resisting structures
Reference14 articles.
1. Kurama Y. C., Sritharan S., Fleischman R. B., Restrepo J. I., Henry R. S., Cleland N. M., Ghosh S. K., Bonelli P., Seismic-Resistant Precast Concrete Structures: State of the Art, Journal of Structural Engineering, ASCE (2018)
2. Park R., The FIB State-of-the-Art Report on the Seismic Design of Precast Concrete Building Structures, Pacific Conference on Earthquake Engineering (2003)
3. FIB, Structural Connections for Precast Concrete Buildings, Bulletin 43, International Federation for Structural Concrete, Stuttgart (2008)
4. Elliot K. S., Precast Concrete Structures, Oxford (2002)
5. ACI 318-11, Building Code Requirements for Structural Concrete and Commentary, ACI Committee 318 (2011)
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献