Author:
Oleinik Pavel,Yurgaytis Alexey,Voronina Galina,Makarenko Alisa
Abstract
This article describes the methods of forming and optimizing the calendar plans of construction enterprises, their nature and applicability in different specific cases. The main types of schedules and schedules of planning of building processes and normative documents used in the formation of calendar plans are also described. In addition to existing and actively used methods for optimizing calendar plans, new directions for the development of optimization algorithms are described, which are just beginning to be introduced into building technologies.
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献