Author:
Hauser Vladimír,Kravchenko Kateryna,Nozhenko Olena,Loulová Mária
Abstract
In urban railway environments, in many respects, the problem of tramcars passing small radius arches appears to be topical. In this regard, the authors proposed that the wheelsets should be complemented on the outer side of the wheels with a second tread of a lower radius, intended exclusively for ride in arches of the track with a radius which the conventional wheelsets cannot even theoretically pass without creep. The complemented wheel tread enters into operation (or out of action) as a result of passing over a specially shaped rail located in the intersections before and behind the small radius arc. In this process, there is a change in the wheel-rail contact location - similar to what is commonly used when riding on a facing rail located in the immediate vicinity of the point frog. The paper deals with the comparison of these two cases based on a simulation analysis of vehicle ride in the calculation program.
Reference32 articles.
1. Evans J. R., Lee T. K. Y., Hon C. C., Vehicle System Dynamics. 119-127. (2009)
2. Jenks CH. W., et. al., Track Design Handbook for Light Rail Transit, 686 p. https://www.nap.edu/read/22800/chapter/
3. Eken E., Friberg R., Modelling of dynamic track forces generated by tram vehicles. 130 p. (2015)
4. Šťastniak P., Smetanka L., Moravčík M., Manufacturing Technology. 17, 2, 250–256 (2017).
5. Tkachenko V., Sapronova S., Kulbovskyi I., Fomin O., Eastern European Journal of Enterprise Technologies. 5. 7-89, 65–72. (2017)
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献