Author:
Dmitrenko Aleksey,Karaseva Arina,Osipov Dmitriy
Abstract
The theory of traffic flows suggests the possibility of using the analogy of handling transport units with hydraulic and other streaming processes. Railway stations, by analogy with HPPs, can be considered as compensation tanks, which ensure smoothing of fluctuations of the flows of transport units. The number of main tracks on the hauls affects the intensity and other parameters of traffic flows, which should be taken into account in calculating the track development of stations. The use of analogies with hydraulic flows allows proposing new methods for calculating the required capacity of compensating accumulators, i.e. track development of stations. In this regard, it is urgent to develop methods for correcting the calculation of the track development of stations in conditions of a change in the number of main tracks on the hauls. The purpose of the study was to develop a method for estimating the load at a station and the magnitude of the corresponding track development in conditions of a change in the number of main tracks on the hauls. The methods of simulation modeling and mathematical statistics are used. The result of the study will be a method for correcting the calculation of the track development of technical railway stations with a change in the number of main tracks on the hauls, as well as recommendations for estimating the stability of train traffic passing.
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献