Critical path analysis programming method without network diagram

Author:

Hein Soe Paing,Min Htike Thein

Abstract

Project scheduling is an important task in project management which monitors the project duration, resource utilization and affects the benefit of project for all kinds of project such as construction, IT, renewable energy, product design and manufacturing etc. Among many methods for project management, critical path method (CPM) is one of the better-known planning and control techniques in project scheduling. In this study, CPM-based computerized program was developed together with modeling of step by step calculations of parameters of interest such as earliest starts and finishes, slack and float times of project activities resulting in determination of critical path for the project. One advantage of computer implementation of CPM using MATLAB in this study is that unlike conventional method, it eliminates necessity to conventionally draw network diagram to perform critical path analysis.

Publisher

EDP Sciences

Subject

General Medicine

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Optimization of Sei Wampu Dam Project Schedule Using Critical Path Method;IOP Conference Series: Materials Science and Engineering;2020-05-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3