Load testing of Highway Bridge

Author:

Bujňáková Petra,Jošt Jozef,Farbák Matúš

Abstract

New segmental concrete bridge has been built near the city Žilina, aligned on European highway corridor E 50. The bridge is composed of the two separate precast prestressed box girder structure constructed by balanced cantilever method. The total length of both structures is 1042 m. The similar superstructure consists of a total of eighteen continuous spans with main spans of 60.5 m. The construction process, load carrying capacity and monitoring of the bridge has been investigated before the opening of the bridge. The paper presents verification of the structural behaviour of the bridge under static load compared to predicted model for both precast prestressed structures.

Publisher

EDP Sciences

Subject

General Medicine

Reference12 articles.

1. Bujňák J., Design review of the right bridge SO 209 at the highway construction D1 Hričovské Podhradie – Lietavská Lúčka (University of Žilina, Slovakia, 07/2015)

2. Bujňák J., Design review of the left bridge SO 209 at the highway construction D1 Hričovské Podhradie – Lietavská Lúčka (University of Žilina, Slovakia, 11, 2015)

3. Bujňák J J., Bujňáková P., Monitoring report of the bridge SO 209 at the highway construction D1 Hričovské Podhradie – Lietavská Lúčka (University of Žilina, Slovakia, 2018)

4. Massicotte B., Picard A., PCI Journal, May-June, 66- 80 (1994)

5. Hassan M., Burdet O. and Favre R., IABSE Colloquium: Remaining Structural Capacity, Copenhagen, Denmark, March (1993)

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3