1. Ageev A.A. and Baburin A.E., Approximation algorithms for uet scheduling problems with exact delays.Oper. Res. Lett.35(2007) 533–540.
2. Ahr D., Bekesi J., Galambos G., Oswald M. and Reinelt G., An exact algorithm for scheduling identical coupled tasks.Math. Methods Oper. Res.59(2004) 193–203.
3. K. Baker,Introduction to Sequencing and Scheduling. J. Wiley, New York (1974).
4. Baptiste P., A note on scheduling identical coupled tasks in logarithmic time.Disc. Appl. Math.158(2010) 583–587.
5. Bekesi J., Galambos G., Oswald M. and Reinelt G., Improved analysis of an algorithm for the coupled task problem with uet jobs.Oper. Res. Lett.37(2009) 93–96.