Abstract
Construction projects are typically carried out under high-risk conditions and managers are forced to handle a great deal of uncertainty during the construction process. The Earned-Value Analysis is a control technique that provides early warnings of performance by quantitative measures, enabling timely corrective actions to ensure project success. This method was developed to control and adjust the project's baseline during execution. The objective of this article is to discuss the main implications of using EVA in construction projects through a case study. Results proved the applicability of the method in the construction industry. The various indicators generated allow managers to make forecasts for optimistic, realistic, and pessimistic scenarios, having the opportunity to correct any deviations in advance. In addition to forecasts, benchmarking data can be generated for the planners or companies responsible for the project, thus increasing the accuracy of future projects.
Publisher
Trans Tech Publications, Ltd.
Reference17 articles.
1. A. Verma, K.K. Pathak and R.K. Dixit. Earned value analysis of construction project at Rashtriya Sanskrit Sansthan, Bhopal. Int. J. Innov. Res. Sci. Eng. Tech. Vol. 3(4), (2014).
2. M. Waris, M.F. Khamidi and A. Idrus. The cost monitoring of construction projects through earned value analysis. KICEM J. Const. Eng. Proj. Manag. Vol. 2(4), (2012), pp.42-45.
3. K. Araszkiewicz and M. Bochenek. Control of construction projects using the earned value method – case study. Open Eng. Vol. 9, (2019), pp.186-195.
4. T. Chin-Keng and N. Shahdan. The application of earned value management (EVM) in construction project management. J. Tech. Manag. Busin. Vol. 2(2), (2015).
5. B.P. Rao and J. Cherian. Earned value analysis on an ongoing residential building project in Bangalore, India. Int. Resear. J. Eng. Tech. Vol. 2(3), (2015).