Abstract
PT. Naturindo Fresh is a company that produces and distributes original Indonesian herbal medicines. The company does not have a planned schedule to minimize the total production time. The production is carried out by considering the products stock and the number of orders from consumers. The employees are free to randomly choose which products will be produced first. The purpose of this research is to determine the job sequence and calculating the total production time (makespan), and identify the sequence that create smallest makespan. The methods used in this research are Campbell, Dudek, & Smith (CDS) method, Palmer method, and Dannenbring method. The calculation results shows that the company's actual scheduling produces a makespan of 30,725.08 minutes. The result of CDS method produces the makespan of 30,634.18 minutes. Palmer's method produces the makespan of 30,743.75 minutes, and the Dannenbring method also yield the makespan of 30,743.75 minutes. In conclusion, the job scheduling with CDS method has the smallest makespan which is recommended to be applied in the company to minimize the total production time.
Publisher
Trans Tech Publications Ltd
Reference5 articles.
1. Bedworth, David D dan James E.Bailey.1982. Integrated Production Control System Management, Analysis and Design. John Willey and Sons. New York.
2. Baker, K. R., & Trietsch, D. (2019). Principles of Sequencing and Scheduling (2nd ed.). John Wiley & Sons, Inc.
3. Ginting, R. (2009). Penjadwalan Mesin, Edisi Pertama (Edisi Pertama). Graha Ilmu.
4. Mazda, N. C. (2018). Penjadwalan Produksi Flow Shop Menggunakan Metode Dannenbring, Branch And Bound Dan Nawaz, Enscore And HAM (NEH) Pada Pembuatan Tas Kulit Di PT M. Joint Exclusive Leathercraft Yogyakarta. Universitas Islam Negeri Sunan Kalijaga.
5. Pinedo, M. L. (2016). Scheduling Theory, Algorithms, and System (5th ed.).