Affiliation:
1. Shanghai Jiaotong University
Abstract
This article investigates the flexible job-shop scheduling problem (FJSP) with multi-uncertain. A proactive-reactive scheduling mechanism is put forward to against the fluctuating process time and equipment breakdowns. This mechanism consists of two stages, including proactive scheduling stage and reactive scheduling stage. In the proactive scheduling stage, the redundancy-based technique is used to generate robust baseline schedules; in the reactive scheduling stage, a reactive scheduling is adopted to rectify the predictive scheduling to adapt to the occurrence of machine failures. Based on this, an integrating algorithm is presented with the goal of the make span. Numerical experiments show that the proposed algorithm has a better performance than Genetic Algorithm (GA) on flexible job-shop scheduling problem under processing time uncertainty and the reactive scheduling algorithm can handle the equipment breakdown with little robustness lost.
Publisher
Trans Tech Publications, Ltd.
Subject
Mechanical Engineering,Mechanics of Materials,General Materials Science
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献