Affiliation:
1. Guangxi University
2. South China University of Technology
Abstract
IEC 61850-9-2 proposes the process bus communication for protection and automation within substations. The actual performance of process bus such as real-time, security and reliability are of concern, when transmission of sample values and trip signals over the same network. This paper presents the establishment of a dynamic simulation test platform, in order to facilitate the test of protection schemes over the process bus. An example is given to demonstrate that incorrect switch configuration, message priority tagging, and the volumes of traffic on the network may have an impact on the real time and reliability of the signals to be delivered.
Publisher
Trans Tech Publications, Ltd.
Reference5 articles.
1. IEC 61850 Communication networks and systems in substation. Part 9-2: Specific Communication Service Mapping (SCSM)-Sampled values over ISO/IEC 8802-3.
2. T. Skeie, S. Johanessen, and C. Brunner, Ethernet in substation antomation, IEEE Control Syst. Mag., vol. 22, no. 3, pp.43-51, Jun. (2002).
3. F. Engler, T. L. Kern, L. Andersson, B. Kruimer, G. Schimmel, and K. Schwarz, IEC 61850 based digital communication as interface to the primary equipment, in Proc. CIGRE, 2004, B3-205.
4. G. Kanabar, S. Sidhu. Performance of IEC 61850-9-2 process bus and corrective measure for digital relaying, IEEE Trans. Power Del., vol. 2, p.740–741, August (2009).
5. J. Mo, J C Tan. Evaluation of process bus reliability, in Proc. 2010DPSP International Conf., pp.14-19.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献