Abstract
It is convenient and effective to use Monte Carlo simulation (MCS) technique in project schedule risk analysis and assessment, but at the same time, the indexes put forward by scholars up to now is quite few, leaving construction schedule risk assessment still difficult to carry out. Therefore, based on PERT network assumption, the shortcomings of current project schedule risk indexes are summarized and new project schedule risk index is put forward to estimate the criticality of each activity and path to provide more information for project schedule controllers. In the case studied, with the application of the new index, the critical index of each activity is given and divided into five levels, and the new index put forward in this paper shows great superiority over the classic indexes.
Publisher
Trans Tech Publications, Ltd.
Reference7 articles.
1. J. J. Martin, Distribution of the Time through a directed, a cyclic network, Operations Research, vol. 13(no. 1): 4-66, (1965).
2. Ting-wei Yuan On application of improved PERT in rick analysis of construction process [J]. Shanxi Architecture, , 2010, Vol. 36(No. 3): 211-213.
3. T.M. Williams. Criticality in Stochastic Networks [J]. J. Oper . Res. Soc , Apr. 1992, vol. 43 (No. 4): 353-357.
4. Jae Gyeun Cho, Bong Jin Yum. An Uncertainty Improtance Measure of Activities in PERT Networks[J]. International Journal of Production Research, 1997, Vol35(No. 10): 2737- 2758.
5. Wannan Cui, Jiajun Qin, Yuan Chao. Criticality Measurement in PERT Networks[R]. Confrence–Proceedings-IEEE International Conference on System, Man and Cybernetics, 2007, vol. 1: 703-706.