1. Leung L C,Khator S K,Schnepp J.Planning substation capacity under the singer contingency scenario[J].IEEE Trans on Power Systems,1995(3):1442-1447.
2. Fan M T, Zhang Z P, et al. Enabling Technologies for Active Distribution Systems [J], Proceedings of the CSEE, 2013 , 33(22): 12-18.
3. You Y, Liu D, Technology and Its Trends of Active Distribution Network [J], Automation of Electric Power System, 2012 , 36(18): 10-14.
4. Kong T, Cheng H Z, et al. Review of Power Distribution Network Planning [J]. Power System Technology, 2009, 33 (19): 92-99.
5. Yang W J, Kang C Q, et al. Short Term Probabilistic Load Forecasting Based on Statistics of Probability Distribution of Forecasting Errors. Automation of Electric Power System, 2006. 30(19): 47-52.