Affiliation:
1. Electric Power Research Institute of Guangdong Power Grid Corporation
2. Raisecom Technology Co., Ltd
Abstract
Under the condition that the increasing number of devices and invariable server hardware facilities in intelligent substation control system, an optimization algorithm of equipment polling strategy in intelligent substation control system is proposed in this paper. This paper proposes an equipment polling mechanism based on time slice scheduling, which is used to solve the problem that the entire network equipment need to detect at the same time on the hour, making the tremendous pressure to the control system. By using the proposed algorithm, it can effectively balance the load in the control system.
Publisher
Trans Tech Publications, Ltd.
Reference10 articles.
1. Stallings W: SNMP and SNMPv2 the infrastructure for network management, submitted to Journal of IEEE Communications Magazine (1998).
2. Thottan M, Ji C: Using network fault predictions to enable IP traffic management, submitted to Journal of Journal of Network and Systems Management (2001).
3. Zheng Hongfang, Yuan Zhenwei, Wang Guangxing: Intelligent Polling Scheme of Fault Management in the MAN, submitted to Journal of Journal of Northeastern University (2005).
4. Ahn B, Ahn S, Chung J: Topological-order based dynamic polling scheme using connected component computation, submitted to Journal of Future Generation Computer Systems (2004).
5. Sterritt R: Facing fault management as it is, aiming for what you would like it to be, submitted to Journal of Lecture Notes in Computer Science (2002).