In an oilfield factory, the blocking and jam in Chang 2 reservoir is very serious. In recentyears, according to analysizing different plugging mechanism and optimizing acidizing formula, theoptimal plugging removal technology was formed suitable for the solution for the Chang 2 reservoirof oilfield factory. This plugging removal formula increases the efficiency radius, and increases thedosage of additives to protect the pipe, rod and pump from the precipitation such as Ca2+and Mg2+,which causes new pollution. Reasonable multiple technologies were designed, and low displacementmethod was used in the injection process, aiming at the characteristics of Chang 2 reservoir. Thismethod extends the time of plugging removal fluid staying around the well bore, which can eliminateplugging near well bore area effectively, and improve the permeability. DQ-1 composite pluggingremoval and other kinds of plugging removal methods have been used more than 50 times, and theeffect is remarkable, which made a positive contribution to stable production of the oilfield.
Publisher
Trans Tech Publications, Ltd.
Subject
Condensed Matter Physics,General Materials Science,Radiation
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献