1. T. Shinmura and H. Yamaguchi: JSME Int. J., Part C, Vol. 38 (1995), p.798.
2. H. Yamaguchi, T. Shinmura and T. Kaneko: Int. J. Japan. Soc. Prec. Eng., Vol. 30 (1996), p.317.
3. Y. Zou and T. Shinmura: Trans. Japan. Soc. Mech. Eng., Part C, Vol. 68 (2002), p.1575. Before finishing After finishing (100 min) 10mm 10mm Ra = 4. 5µm Ra = 0. 1µm Finished surface Surface roughness Ry, Ra µm Finishing time min.
4. [5] [10] [15] [20] [25] [30] [35] 0 20 40 60 80 100.
5. 2000 4000 6000 8000 10000 Ry Ra M.