Influence of the Characteristics of Cement Plug on well Integrity for Offshore Abandonment
-
Published:2019-01
Issue:
Volume:944
Page:1028-1034
-
ISSN:1662-9752
-
Container-title:Materials Science Forum
-
language:
-
Short-container-title:MSF
Author:
Zhang Xin1, Li Jun1, Zhao Chao Jie1, Luo Kui Dong1, Zhang Di1
Affiliation:
1. China University of Petroleum
Abstract
With the development of offshore oil fields into the middle and late stages, more and more oil wells are facing the problem of disposal. The reliability of the plugging between the cement plug and the wellbore is directly related to the safety of offshore operations and the problem of marine ecological damage caused by oil and gas leakage. Starting from the cement failure mechanism between the cement plug and the casing, consider the heterogeneity of the formation and the magnitude of the ground stress. The finite element software is used to simulate the interaction between the cement plug and the casing with different characteristics, and then judge the risk of sealing failure. Furthermore, the influence of cement plug properties on casing stress and cementation strength is obtained. Study show that the use of high strength, low modulus of elasticity, low Poisson's ratio cement is conducive to prevent cement plug tensile failure. When the local layer is hard, the method of reducing the elastic modulus of the cement plug can be adopted; and when the local layer is soft, the method of appropriately increasing the elastic modulus of the cement plug should be adopted. It has certain guidance and reference significance for the safe disposal of offshore wellbore.
Publisher
Trans Tech Publications, Ltd.
Subject
Mechanical Engineering,Mechanics of Materials,Condensed Matter Physics,General Materials Science
Reference10 articles.
1. Saasen, A., Fjelde, K. K., Vralstad, T., Raksagati, S., & Moeinikia, F. (2013, May 6). Plug and Abandonment of Offshore Exploration Wells. Offshore Technology Conference. 2. Aas, B., Sørbø, J., Stokka, S., Saasen, A., Statoil, R. G., Lunde, Ø., Vrålstad, T. (2016, March 1). Cement Placement with Tubing Left in Hole during Plug and Abandonment Operations. Society of Petroleum Engineers. 3. Ford, E. P., Moeinikia, F., Lohne, H. P., Arild, Ø., Majoumerd, M. M., & Fjelde, K. K. (2017, April 5). Leakage Calculator for Plugged and Abandoned Wells. Society of Petroleum Engineers. 4. Aguilar, P., Johnson, C. R., Salazar, J., & Bogaerts, M. (2016, April 20). Plug and Abandonment Solution for Oilfield Decommissioning in the North Sea. Society of Petroleum Engineers. 5. Li Jun, Chen Mian ,Zhang Guangqing, Zhang Hui. Finite element analysis of casing stress in elliptical wellbore in easily collapsed stratum[J]. Journal of China University of Petroleum(Edition of Natural Science), 2004, 2(82): 45-48.
|
|