Affiliation:
1. National Institute of Advanced Industrial Science and Technology (AIST)
Abstract
We describe the recent installation of a new slow positron beamline at AIST and our plans to develop a dedicated superconducting accelerator for positron production. The new positron beamline is already installed and should be operational by the end of this fiscal year (March 2012). Initially positrons will be generated using a 70 MeV electron beam from the existing accelerator directed onto a newly installed converter and moderator assembly. The beamline has two experimental ports both dedicated to positron lifetime spectroscopy, one port with a focused beam (diameter ~ 30 microm) and the other unfocussed (~ 10 mm). A superconducting accelerator for positron production is currently under development. When completed, it will deliver a high frequency (~ MHz), high current (~ mA), short pulse length (< 100 ps) beam to the positron production target. We investigate the possibility of transporting the positron pulses thus produced directly onto samples for lifetime measurement. Such a scheme would remove the necessity for pulse stretching and chopping which is required with the existing LINAC and should allow for greatly increased slow positron transport efficiency.
Publisher
Trans Tech Publications, Ltd.
Subject
Mechanical Engineering,Mechanics of Materials,Condensed Matter Physics,General Materials Science
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献