Abstract
In order to solve the problem of duration predicting in the project with poor information, small sample and uncertainty, a method based on grey system theory is put forward to predicting the duration of the coupled task set. A grey duration prediction model GM(1,1) is built, and the accuracy of the model is tested through residual, degree of incidence and posterior variance. Finally, the feasibility of the prediction model is verified by a practical application case.
Publisher
Trans Tech Publications, Ltd.
Reference9 articles.
1. J.G. Liu, D. B Tang, C. Yang: Computer Integrated Manufacturing Systems Vol. 15(2009), pp.1715-1720, in Chinese.
2. W.M. Chen, T.G. Chen, R.B. Xiao: Computer Integrated Manufacturing Systems Vol. 16(2010), pp.271-279, in Chinese.
3. J. U. Maheswari, K. Varghese: International Journal of Project Management Vol. 23(2005), pp.223-230.
4. W. M. Zhang, M. C. Zhu, H. M. Chen: IEEE International Conference on Wireless Communications Networking and Mobile Computing Vol. 18(2008), pp.1-4.
5. G. Simonin, R. Giroudeau, C. König: Electronic Notes in Discrete Mathematics Vol. 36(2010), pp.647-654.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献