1. Zhang Shaqing, Chen Xindu, Chen Qingxin, Chen Xin. The research summarized and discussed of production project scheduling under uncertain environment. Computer application and research,2011, 28(3): 809-813.
2. Vieira G.E., Herrmann J.W. and Lin E. Rescheduling manufacturing systems: a framework of strategies, policies, and methods. Journal of Scheduling, 2003, 6(1): 39-62.
3. S. Allet. Handling flexibility in a"generalized job shop"with a fuzzy approach. European Journal of Operational Research, 2003, 147(2): 312-333.
4. Guo Qingqiang, Li Qiqiang, Li Ming, Ding Ran. An achieving method of dynamic scheduling in continuous process. Computer Engineering and Applications, 2010, 46 (15): 198-200, 238.
5. Liu Lin, Gu Hanyu, Xi Yugeng. The dynamic workshop rolling rescheduling of arrival time unknown [J]. Chinese Journal of Mechanical Engineering. 2008,44(5): 48-50.