Affiliation:
1. Baker Hughes Inc.
2. Northeast Petroleum University
Abstract
10,000 ft horizontal drilling and hydraulic fracturing with 24 to 36 stages are prominent in Bakken petroleum system with great success. Although advanced automated drilling system with cutting edge comprehensive logging units are available from service providers to obtain various data assisting comprehensive real-time analysis, conventional positive displacement motor (PDM) with mud-pulse (MP) measurement while drilling (MWD)/logging while drilling (LWD) system is still widely applied in this area to steer and navigate the well bore in pay zone with cost-effectiveness and efficiency. In this paper, several field cases for MP MWD/LWD systems will be discussed and lessons will be summarized to help optimize rate of penetration (ROP), reduce non-productive rig time, and improve operators drilling practices.
Publisher
Trans Tech Publications, Ltd.
Reference3 articles.
1. Stephen A. Sonnenberg. 2010 Focusing on the Bakken, Bakken/Three Forks The play book pp.4-20, July (2010).
2. Guangzhi Han, Wilfredo A. Davila, Eric C. Magnuson, Azar A. Azizov, 2013. Practical Directional Drilling Techniques and MWD Technology in Bakken and Upper Three Forks Formations in Williston Basin North Dakota to Improve Efficiency of Drilling and Well Productivity, SPE 163957.
3. E.I. Nakken, S. Mjaaland, A. Solstad, 1995. A New MVVD Concept for Geological Positioning of Horizontal Wells, SPE 30454.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献