Affiliation:
1. Dr. M.G.R. Educational and Research Institute University
2. Dr. MGR Educational and Research Institute
Abstract
In recent engineering practices, the manufacturing industries are more technically able to produce product with high quality to desire the customer needs. For accomplishing customer needs many lean tools are used to improve the methods of manufacturing practices in industries. The aim of this research work is enhance the productivity of spool casing assembly used in horn armature core per shift by using method study, time study and VSM. Cycle time for each operation of the product is determined by time study and the value added, non-value-added activities and transportation wastes occurred in the current state process identified and plotted in the current state VSM. The future state VSM was developed to reduce unnecessary wastes such as transportation, inventory, waiting which occurred in the current state VSM. Both current and future state time study are simulated using Flexsim simulation software. From the observed results it was found that, P3 and P5 model productivity was improved by about 5.5% and 6.5% respectively after implementation of appropriate lean tools.
Publisher
Trans Tech Publications, Ltd.
Reference25 articles.
1. Veiga, G.L., Lima, E.P., Angelis, J.J. and Costa, S.E.G., The strategic role of lean a discussion, Brazilian Journal of Operations and Production Management, 8(1) (2011) 09-30.
2. Sharma Neha, Matharou Gurpreet Singh, Kaur Simran and Gupta Pramod, Lean manufacturing tool and techniques in process industry, International Journal of Scientific Research and Reviews, 2(1) (2013) 54-63.
3. K. Balakannan et al., Selection and evaluation of supplier by decision model of hybrid data envelopment analysis, International Journal of Applied Engineering Research, 10(62) (2015) 123-127.
4. Dal Forno, A.J. and Forcellini, F.A., Lean product development: Principles and practices, Product: Management and Development, 10(2) (2012) 131-143.
5. Praveen Saraswat, Deepak Kumar and Manoj Kumar Sain, Reduction of work in process inventory and production lead time in a bearing industry using value stream mapping tool, International Journal of Managing Value and Supply Chain, 6(2) (2015) 27-35.
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献