Factors Affecting Water Breakthrough Time of a Vertical Well Subject to Double-Edge Water Drive Mechanism

Author:

Dongo Valentine E.1,Adewole E. Steve1

Affiliation:

1. University of Benin

Abstract

Water production in an oil well is undesirable both economically and environmentally. Therefore water arrival pattern into a well has to be understood clearly where a reservoir is surrounded by an aquifer. However, predicting the breakthrough time of water in a producing well has been a controversial issue and a major challenge to petroleum engineers. This paper investigates water arrival pattern into a vertical well completed in reservoir with double-edge water external lateral boundaries to be able to understand important factors affecting water breakthrough. Water breakthrough time is the time it takes for the first droplet of water cut to reach the wellbore under the prevailing production rate regime. This marks the end of the production of clean oil from the well. Once the breakthrough time is approached, depending on the strength of the external boundary (supplying aquifer) the pressure responses in the reservoir first attain a steady state condition. Further production then leads to steady rise in produced water-oil ratio. Real time dimensionless pressure distribution, using appropriate source functions for a vertical well in a reservoir with double-edge water as its lateral external boundaries was utilized for the study. Well responses were computed for a wide range of reservoir, wellbore and fluid properties. Results show that water breakthrough time is strongly affected by the lateral distance of the external edge water from the perforations according to the relation tDx2eD2(kh/ kv). Not too far edge water would yield earlier breakthrough than far away edge water for a well completed in an isotropic reservoir. In a largely horizontally anisotropic reservoir therefore, water breakthrough may be delayed if the water from the edges respond unequally to a production transient in the well. For a reservoir with reasonable horizontal isotropy, only central well location may delay water breakthrough. If this does not yield the desired delay, then the perforation should be located farther vertically above the points opposite to the pay zone.

Publisher

Trans Tech Publications, Ltd.

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3