Abstract
This paper considers the bicriteria scheduling problem of minimizing the total earliness and the total tardiness on a single machine with release dates. In view of the fact that the problem has been characterized as NP-Hard, we propose two approximation algorithms (labeled as ETA1 and ETA2) for solving the problem. The proposed algorithms were compared with the MA heuristic selected from the literature. The two criteria (the total earliness and the total tardiness) were aggregated together into a linear composite objective function (LCOF). The performances of the algorithms were evaluated based on both effectiveness and efficiency. The algorithms were tested on a set of 1200 randomly generated single machine scheduling problems. Experimental results show that both the ETA1 and ETA2 algorithms outperformed (in terms of effectiveness and efficiency) the MA heuristic under all the considered problem sizes. Also, the ETA1 algorithm outperformed the ETA2 algorithm when the number of jobs (n) ranges between 20 and 500.
Publisher
Trans Tech Publications, Ltd.
Reference18 articles.
1. S.M. Johnson, Optimal two- and three- stage production schedule with setup times included, Naval Research Logistics, 1 (1954) 61-68.
2. C. L. Chen, R.L. Bulfin, Complexity of single machine, multi-criteria scheduling problems, European Journal of Operational Research, 70 (1993) 115-125.
3. M. Ehrgott, X. Grandibleux, An Annotated Bibliography of Multiobjective Combinatorial Optimization, Report in Wirtschaftsmathematik, No. 62, Fachbereich Mathematik - Universitat Kaiserslautern, (2000).
4. S. French, Sequencing and Scheduling. Ellis Horwood Limited, Chichester, (1982).
5. A. Nagar, J. Haddock, S. Heragu, Multiple and bicriteria scheduling: A literature survey, European Journal of Operational Research, 81 (1995) 88-104.