Affiliation:
1. Chinese Academy of Sciences
2. Liaoning Electric Power Company Limited
Abstract
This paper presents an automatic inspection robot for insulators installed on 500kV power transmission lines. In order to detect the poor insulators automatically, the robot’s behaviors are analyzed, and a behavior control model based on Finite State Machine (FSM) is established. Moreover, an exception handling method is proposed based on sensors and timers. The results of experiments in the laboratory prove that the control methods mentioned above are correct and valid. Experiments on a 500kV transmission live line show that the inspection robot can not only automatically move along the double insulator strings with variable intervals, but also reliably handle the abnormal conditions including slipping, power shortage, deadlocking, sensor abnormity, and probe loosening.
Publisher
Trans Tech Publications, Ltd.
Reference12 articles.
1. Ikenaga. T, Miyamoto. T. Inspection device for bad insulator [P], JP19810080278, 1981-05-26.
2. Weiping. L. The Charged Detection of the High Voltage Transmission Line Insulators, Power Supply, 1996, 13(2): 27-29.
3. ByungHak. C, SeungHyun. B, JoonYoung. P, et al. Development of automatic inspection robot for live-line insulators [A], Proceedings of the IEEE International Conference on Transmission and Distribution Construction and Live Line Maintenance, ESMO. Albuquerque, NM, USA: 2006IEEE, 1-5.
4. Seung-Hyun. B, Byung-Hak. C, Joon-Young. P, et al. Implementation of Control System for Insulator Cleaning Robot[A], SICE-ICASE International joint Conference 2006. Bexco, Busan, Korea. 2006ICASE, 3044-3047.
5. Joon-Young. P, Byung-Hak. C, Seung-Hyun. B. Development of Automatic Cleaning Robot for Live-line Insulators[A], Proceedings of the IEEE International Conference on Transmission and Distribution Construction and Live Line Maintenance, ESMO. Albuquerque, NM, USA: 2006IEEE, 1-7.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献