Affiliation:
1. Silesian University of Technology
Abstract
In the paper a production model with failures is presented where successive failure-free times are supposed to have normal distributions and are followed by normally distributed times of repairs. Unknown parameters of the distribution are estimated using e.g. empirical moments approach. Predictions of unknown parameters are done using classical regression method. Having Mean Time To First Failure, and Mean Time of Repair a disturbance robust predictive schedule is generated using an immune algorithm and rule Minimal Impact of Disturbed Operation on the Schedule.
Publisher
Trans Tech Publications, Ltd.
Reference7 articles.
1. A. Duenas, D. Petrovic: An approach to predictive-reactive scheduling of parallel machines subject to disruptions. Ann Oper Res., Vol. 159 (2008), p.65.
2. W. Herroelen, R. Leus: Robust and reactive project scheduling: a review and classification of procedures, Int. J. Prod. Res., Vol. 42, No. 8 (2004), p.1599.
3. S. Gurel, E. Korpeglu, M.S. Akturk: An anticipative scheduling approach with controllable processing times, Computers & Operations Research, Vol. 37, Issue 6 (2010), p.1002.
4. K. Kalinowski: Scheduling of production orders with assembly operations and alternatives. Flexible Automation and Intelligent Manuf., FAIM2009, Teesside 2009, Great Britain, p.85.
5. W. M. Kempa, I. Wosik, B. Skołud: Estimation of reliability characteristics in a production scheduling model with time-changing parameters – first part. Management and control of manufacturing processes, Lublin, Poland (2011), p.7.
Cited by
18 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献