Abstract
In order to make the coal exploitation to the healthy and sustainable development, the reasonable deployment of development of coal resources insist on shutting down before the integration, with the principle of the big merging into the small and the inferior merging into the superior. Coordinating to Hongfa coal mine and Luda coal mines In Ding Qi town. By integrating, it can achieve the goal of coal mine safety production and optimization of coal resources, and also can solve some problems left over by history. Through the analysis of local water resources development and utilization, we adopt the method of rainfall to inquire runoff volume and the frequency analysis to reason the results. The results show that either status quo of the level year or planning level years, Ma Daozi village gulley can completely meet the requirements of project for water, Water intake of water is reliable and the impact is not big to regional water resources.
Publisher
Trans Tech Publications, Ltd.