Affiliation:
1. Shijiazhuang Tiedao University
Abstract
Based on the construction of the subway analysis of risk factors, through the integration of the owners and the construction side of the interface and enhance training, established based on GIS (geographic information system) and artificial intelligence support to high-speed broadband networks as the basis, with advanced technology, massive data dynamic scheduling based on the use of three-dimensional visual representation of management information systems.
Publisher
Trans Tech Publications, Ltd.