Abstract
The construction process of water conveyance tunnel is complex and stochastic under the karst geological condition. Aiming at analyzing the construction process under this special condition, a simulation modeling method of water conveyance tunnel construction is presented. Through demonstrating the simulation analysis and predicting the schedules in a real case study of a water conveyance tunnel, this method is proved advanced and intuitive for formulating and analyzing the construction schedules under the karst geological condition.
Publisher
Trans Tech Publications, Ltd.
Reference7 articles.
1. D.H. Halpin: Constr. Div. ASCE. Vol. 103(1977), p.489–499.
2. K. J. Kim, Jr. Gibson, G Edward: Automation in Construction. Vol. 12(2003), pp.97-109.
3. M. Lu, M. Anson, S. L. Tang, Y. C. Ying: Constr. Eng. Manage. Vol. 129(2003), p.547–554.
4. H. J. Wang, J. P. Zhang, K. W. Chau, et al: Automation in Construction. Vol. 13(2004), pp.97-109.
5. D. E. Lee: Journal of Construction Engineering and Management. ASCE. Vol. 3(2005), pp.310-318.