Using PERT to Optimise the Completion Time of Air-Conditioning and Mechanical Ventilation (ACMV) Project

Author:

Pang Chuan Kian1,Mohd-Lair Noor Ajian2,Chua Yi Sheng3

Affiliation:

1. Open University Malaysia

2. Universiti Malaysia Sabah

3. Pansar Engineering Services Sdn Bhd

Abstract

An air-conditioning and mechanical ventilation (ACMV) construction project involved many interrelated construction activities with varying durations and multiple dependencies. This paper focuses on the development of a best possible project planning and scheduling technique that can help the project manager to manage and complete the ACMV project in optimal time. The program evaluation and review technique (PERT) is used in this research. The PERT technique helps to determine the probabilities of various stages of the project by specified deadlines and identify the activities on the critical path that have high potential for causing delays in the project completion time. The completion times of 72, 76, 79, and 80 weeks were taken for the PERT analysis. Deadline of 72 weeks is the contractual period of the ACMV project as specified in the contract. Completion time of 76 weeks is the critical path of the project as analyzed by the PERT technique. The deadline of 79 weeks is the proposed completion time for the ACMV project whereas 80 weeks are the actual completion date of the project. The PERT analysis revealed that the project completion time of 72 weeks, which is as stated in the contractual completion time, yielded the probability of completion of 2.67% only. This analysis shows that the contractual period is impossible to be achieved and it is an unrealistic time setting. Further negotiation is required including changing or extending of the contractual completion time. The other completion times are able to be achieved but the company may need to face the high penalty costs due to the delays in completion time.

Publisher

Trans Tech Publications, Ltd.

Reference15 articles.

1. A. Ahmadul, Refrigeration and Air Conditioning, Prentice-Hall of India Private Limited, (2006).

2. S. Katara, and S. Amponsah, Project Planning and Scheduling, the Critical Path Method Approach. BUI Power Project as a Case Study. International Journal of Science, 2 (2013), 33–41.

3. S. Zareei, Project Scheduling for Constructing Biogas Plant Using Critical Path Method. Renewable and Sustainable Energy Reviews, 81 (2018), 756–759.

4. N. Monjezi, M. J. Sheikhdavoodi and H. Basirzadeh, Application of Project Scheduling in Agriculture (Case Study : Mechanized Greenhouses Construction Project). Research Journal of Applied Sciences, Engineering and Technology, 4 (2012), 241–244.

5. A. H. I. Lee, H.-Y. Kang, and T.-T Huang, Project Management Model for Constructing a Renewable Energy Plant. Procedia Engineering, 174 (2017), 145–154.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3