Affiliation:
1. National Formosa University
2. WuFeng Institute of Technology
3. National Chia-Yi University
Abstract
This paper studies the optimization of hole-making operations with multiple tools in which a hole may require various tools to its final size. The objective of this problem is to minimize the summation of tool airtime and tool switch time for the hole-making operations. As known, the problem is NP-hard. In this paper, we show a property that any infeasible permutation of hole-making operations can be transformed into a feasible one. Based upon this property, we apply a PSO based approach for solving a benchmark hole-making problem with the number of feasible operation sequences up to 5.41031. Numerical results indicate that the applied PSO approach can find superior solutions for the benchmark problem in the literature.
Publisher
Trans Tech Publications, Ltd.
Subject
Mechanical Engineering,Mechanics of Materials,General Materials Science
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献