Out-of-Plane Secondary Bifurcation Buckling Behavior of Elastic Circle Pipe Arch

Author:

He Yu Zhi1,Liu Chang Yun1,Hou Zhen Hua1,Zhang Guang Kui1,Chen Xing Hua1,Lin Zi Chen2,Ju Jin San1

Affiliation:

1. China Agricultural University

2. Beijing Forestry University

Abstract

The out-of-plane secondary bifurcation buckling load-displacement equilibrium paths of the elastic circle pipe arch with and without out-of-plane brace at the top of the arch are traced using a new numerical tracing strategy. The out-of-plane secondary bifurcation buckling loads of the arch with the same sections and different rise-span ratios are obtained under the concentrated load at the top of the arch and the full span uniformly distributed load, which are compared with out-of-plane linear buckling load and in-plane primary buckling load. The calculation results show: for the same section circle pipe arches without the out-of-plane brace and under the concentrated load at the top the arch, the out-of-plane secondary buckling load is always less than the in-plane primary buckling load and the out-of-plane buckling will occur before the in-plane primary buckling. The out-of-plane secondary bifurcation buckling load of the arch with 0.2 rise-span ratio is the biggest. The bigger the rise-span ratio is, the bigger the difference between out-of-plane and in-plane buckling load. When the arch is subjected to full span uniformly distributed load, the out-of-plane buckling will also occur before the in-plane primary buckling and the out-of-plane secondary bifurcation buckling load of the arch with 0.4 rise-span ratio is the biggest. The difference between out-of-plane and in-plane buckling load of the arch with 0.2 rise-span ratio is the biggest. For the circle pipe arch with the out-of-plane brace at the top of the arch, the out-of-plane buckling load of the arch with 0.4 rise-span ratio is the biggest under the two load conditions. The brace can raise the out-of-plane buckling load significantly especially for the arch with big rise-span ratio and under full span load. The out-of-plane buckling will occur before the in-plane primary buckling when the arch is under full span uniformly distributed load. The out-of-plane buckling will occur before the in-plane primary buckling only when the arch is under concentrated load and the rise-span ratio of the arch is less than 0.3. No matter there is or not brace for the arch, the ultimate load carry capacity of the arches increase a little bit after the out-of-plane secondary buckling occurs.

Publisher

Trans Tech Publications, Ltd.

Subject

Mechanical Engineering,Mechanics of Materials,General Materials Science

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3