1. Bergman, S.A., Why Not Higher Operating Pressures for Lines Tested to 90% SMYS?, Pipeline and Gas Journal(December 1974).
2. Brooks L.E., High-Pressure Testing – Pipeline Defect Behavior and Pressure Reversals, ASME, 68-PET-24, (1968).
3. Kiefner, J.F., Maxey, W.A., and Eiber, R.J., A Study of the Causes of Failure of Defects That Have Survived a Prior Hydrostatic Test, Pipeline Research Committee, American Gas Association, NG-18 Report No. 111(November 3, 1980).
4. The American Society of Mechanical Engineers,ASME B31. 8—2003 Gas Transmission and Distribution Piping Systems.
5. Canadian Standards Association,CSA-Z662-03 Oil and Gas Pipeline Systems[S].