Affiliation:
1. Shijiazhuang Tiedao University
Abstract
The stability and smoothness of embankment is very important factors for the design of a new high-speed railway project. To make an accuracy prediction of the post-construction settlement, it is necessary to carry out a carefully settlement observation during the construction of embankment. The defects of traditional settlement plate, however, are well known as disturbing construction and destroyed easily by construction. In this paper, based on the application in Shi-Wu passenger dedicated line, a new type of settlement plate has been developed. The application of this new type of settlement plate in site shows that it has no any disturbs on the pavement and compaction of embankment. And measurement becomes simple and easy to operation. Accordingly, high accuracy of settlement observation can be obtained by this method, which has the value of application in high-speed railway settlement observation.
Publisher
Trans Tech Publications, Ltd.
Reference5 articles.
1. SHEN, A., SU, Y. ,YUE, P. Research ON Development and Application of The Multi—function Settlement Plate [J]. Journal of highway and transportation research and development, 2004(11): 1-4.
2. A. Al Shaer, D. Duhamel, K. Sab, G. Foret, L. Schmitt Experimental settlement and dynamic behavior of a portion of ballasted railway track under high speed trains[J] Journal of Sound and Vibration 316 (2008) 211–233.
3. A. Hadi Suroor, PERFORMANCE EVALUATION OF INSTRUMENTED LNG RETENTIONDIKES ON LOUISIANA SOFT CLAYS[M] Seventh International Symposium on Field Measurements in Geomechanics.
4. Robert C. Bachus, Tamara E. Zettler, and James E. Fleming Development of a Settlement Profiling System to Assess MSW Compression Characteristics[M] Seventh International Symposium on Field Measurements in Geomechanics.
5. Jie Han, Jie Huang, Robert L. Parsons Influence of bedrock inclination on elastic settlements of flexible shallow strip foundations Computers and Geotechnics 34 (2007) 53–56.