Affiliation:
1. Southwest Jiaotong University
Abstract
In consideration of the geology and hydrogeology of the strata in Chengdu city, and in view of the general depth of subway station, its main structure and retaining enclosure for foundation pit constructed with open cut method is generalized in this paper. In order to expound the design of subway station structure with open cut method, a typical design of subway station in Chengdu subway line 7 is illustrated in the paper. The design of open cut subway station structure and its enclosure in Chengdu is still summarized and can be used to guide the structural design of subway stations under similar conditions with open cut method (OCM).
Publisher
Trans Tech Publications, Ltd.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献