Affiliation:
1. Universiti Teknologi Malaysia (UTM)
2. Iranian Leasing Company
3. KDU University College
Abstract
Schedule reliability is essential to successfully achieve EPC (engineering, procurement and constriction) project objectives. Several studies in the past were based on traditional risk management technique which has its own limitations that lack one to obtain a reliable project schedule. To overcome these limitations a comprehensive framework is developed based on the integration of risk management and Critical Chain Project Management (CCPM) that can give a much reliable project scheduling. In the proposed framework, risk analysis is first determined through fuzzy FMEA technique to provide identification of critical risk events (CRE). The effect of CRE on project schedule is then defined and total project time which considers risk factors is calculated. To support risk mitigation, fault tree and event tree analysis are combined which allows the root causes of the risk event be defined and also mitigation strategies determined to control each identified CRE. Eventually, CCPM is distributed which enable implementation of the project based on initial plan and to obtain reasonable Feeding Buffer time on risky tasks. This paper presents the proposed framework using a real case study on construction phases of EPC projects in an electrical power industry.
Publisher
Trans Tech Publications, Ltd.
Reference18 articles.
1. T.D. Klastorin, Project Management, Tools and Trade-offs, John Wiley and Sons, New York, (2004).
2. P. E. Josephson, and L. Saukkoriipi, Slöseri ibyggprojekt: Behov av förändrat synsätt, Fou-Väst, Report 0507, Gothenburg, Sweden, (2005).
3. J. K. Lee, Cost Overrun and Cause in Korean Social Overhead Capital Projects, Roads, Rails, Airports and Ports, Journal of Urban Planning and Development. 134(2008) 59-62.
4. D. Aloini, R. Dulmin, Risk Management in ERP Project Introduction: Review of the Literature, Journal of Information and Management . 44(2007) 547-567.
5. G. Themistocleous and S. H. Wearne, Project Management Topic Coverage in journals, International Journal of Project Management. 18(2000) 7-11.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献