Affiliation:
1. Henan Vocational and Technical College of Communications
2. Zhengzhou Nissan Auto Co., Ltd
Abstract
This study proposes a solution to the problems with electric vehicles, which are characterized by short driving range and long time for charging. The battery fast-swap system we studied includes generality power battery, locking system and auto battery pack fast-swap equipment, which only takes owners about four minutes to finish a completed auto power battery swap procedure. At the same time, we use virtual prototyping software hyperworks to evaluate the strength and stiffness of the structure of the battery fast-swap system, all parameters above can meet requirement of mechanical property for electric vehicles. Moreover, we propose a novel business model of “naked car sales-battery lease-battery swap”, which can improve the problem of energy supply in electric vehicle. Particularly, it has a certain significance to perfect the building of charging/battery swap infrastructure standard system.
Publisher
Trans Tech Publications, Ltd.
Reference6 articles.
1. Jian Liu, Electric vehicle charging infrastructure assignment and power grid impacts assessment in Beijing, Energy policy, 2012, 51: 544-577.
2. Jian Wang, Guihang Liang, Battery-quick-replacement operation mode for electric taxi vehicle, Journal of Highway and Transportation Research and Development, 2011, 28(11): 142-145. (In Chinese).
3. Ming Chen, Pure Electric Bus in Shanghai Expo, Bus technology and research, 2011, (2): 64-67. (In Chinese).
4. Daxian Cheng, Machine design handbook, Chemical industry press, Bei Jing, 2008. (In Chinese).
5. Zhiyuan Lu et al., Modal analysis and optimization of electric vehicle's fast-swap battery box, Applied Mechanics and Materials, 2012, 241-244: 1992-(1999).
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献