Abstract
The critical chain project management theory(CCPM) combining the critical chain technology and resource-constrained project scheduling problem (RCPSP) is an important innovation of project control methods, and it’s widely used to optimize the project duration recently. In this paper the theory presented is applied to the maintenance period arrangements of power plant electrical equipment, and a mathematical model of optimizing the maintenance period is established. Then an improved heuristic algorithm is designed and used to establish equipment maintenance precedence network. On this basis, a new identification method of maintenance network based on critical chain is proposed. Finally, it’s verified with a numerical example that the method proposed can effectively shorten the maintenance period of power plant electrical equipment.
Publisher
Trans Tech Publications, Ltd.
Reference9 articles.
1. Leach LP. Critical Cham Project Management Improves Project Performance[J]. Project Management Journal, 1999, 30(2):39-51.
2. Goldratte. Critical Chain [M]. Great Barrington: North River Press, (1997).
3. Saberi A, Lin Z, Teel A R. Control of linear systems with saturating actuator[J]. IEEE Trans on Automatic Control, 1996, 41(3): 368-378.
4. Steyn H. An investigation into the fundamentals of critical chain project management[J]. International Journal of Project Management, 2001, 19(6):363-369.
5. MO Ju-Hua. Project scheduling model and algorithm based on critical chain[D]. Shenyang:Northeastern University, (2005).
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献