Abstract
The reinforcement project is three-storey of the industries building, the total height of the industries building is 14,200mm, the clear height of one storey is 7,500mm, the building area is 1,500 square meters, structural mode is reinforced concrete frame structure. The structural members were damaged seriously due to fire In January 2010, strengthening the damaged members was proposed in order to ensure the safety of the structure. Enlarging section reinforcement method, Polymer Mortar and gluing CFRP methods were adopt to strengthen the beams, columns and floor slab depending on the damage degree of the concrete member.The idea of dealing with the industries building damaged by fire can provide us a good reference of repairing the similar industries building.
Publisher
Trans Tech Publications, Ltd.
Reference5 articles.
1. Zhang Youcai, The inspection, assessment, strengthening and reformation about building structure[M]. Beijing: Metallurgical Industry Press, Oct., 1997. (in Chinese).
2. GB50010-2010. Code for design of concrete structures[S]. (in Chinese).
3. GB50367-2006. Degin code for strengthening concrete structure[S]. (in Chinese).
4. Galal, K. Lateral force–displacement ductility relationship of nonductile squat RC columns rehabilitated using FRP confinement. Struct. Eng. Mech, 2007, 25(1): 75–90.
5. LI Jun-hua, TANG Yue-feng, LIU Ming-zhe, XIAO Han, ZHAO Yin-hai. Experimental Study on Rehabilitation of SRC Columns After Exposure to Fire[J]. ENGINEERING MECHANICS, 2012, 29(3): 177-183. (in Chinese).