Affiliation:
1. CCCC-Tianjin Port Engineering Institute, Ltd.
Abstract
In urban environment, short-distance crossing of shield tunneling to existent piles is an unloading process and can cause adverse effect on the piles. This kind of effect should be controlled. To analysis and control this effect, numerical simulation, field monitoring and optimization of construction parameter were used in this study. To get reasonable calculation parameters for numerical models, field monitoring was conducted. The numerical simulation was utilized to study the process of short-distance crossing and the effect of ground improvement with rotary jet grout pile. The simulation result revealed that the ground improvement is not necessary in soft soil if the pile is long enough. In the later practical tunneling process, the ground improvement in the initial design was canceled. Construction parameters were adjusted in time, such as the strict controlling of synchronized grouting, secondary grouting, rotation speed of cutter head and driving speed. As a result, the displacement of the existent piles was controlled in the tolerable ranges.
Publisher
Trans Tech Publications, Ltd.
Reference7 articles.
1. Clough G W, Sweeney B P, et. al.: Journal of Geotechnical Engineering, Vol. 109 (1983), p.119.
2. Lee K M, Ji H W, Shen C K, et a1.: Soils and Foundations, Vol. 39(1999), p.113.
3. Wang Qingguo, Sun Yuyong: Chinese Journal of Underground Space and Engineering, Vol. 4(2008), p.860. (in chinese).
4. Yu Ning, Zhu He-hua: Rock and Soil Mechanics, Vol. 25(2002), p.1330. (in chinese).
5. Fang Yong, He Chuan: Rock and Soil Mechanics, Vol. 28(2007), p.1402. (in chinese).
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献