Abstract
Due to the shortcomings of conventional methods, the temperature control in rapid construction of Guandi dam is less effective. Then improved measures are designed and implemented based on the dynamic control method of pipe cooling, which depends on the real-time adjustment of five factors affecting pipe cooling (beginning time of cooling, lasting time of cooling, water temperature, rate of flow and direction of flow). The monitoring and feedback calculation are conducted. It is found that the newly-designed measures have obvious effect, and that there are no harmful cracks in the whole construction of Guandi dam. The conclusion is that it can effectively solve the problem of temperature control and crack prevention of high RCC dam via these measures, and provide some guide and reference to other similar projects.
Publisher
Trans Tech Publications, Ltd.
Reference5 articles.
1. Zhu Bo-Fang: Thermal stresses and temperature control of mass concrete structure (China Waterpower Press, China 1999).
2. Miguel Cervera, Javier Oliver, Toma´s Prato: Simulation of Construction of RCC Dams. I: Temperature and Aging, ASCE, Journal of Structural Engineering. Vol. 126 (2000), p.1053.
3. Miguel Cervera, Javier Oliver, Toma´s Prato. (2000): Simulation of Construction of RCC Dams. II: Stress and Damage. ASCE, Journal of Structural Engineering. Vol. 126 (2000), p.1062.
4. Ronaldo Luna, and Yong Wu: Simulation of temperature and stress fields during RCC dam construction. Journal of Construction Engineering and Management. Vol. 126 (2000), p.381.
5. Zhu Bo-fang: Concrete dam from earlier age with smaller temperature difference and longer time. Water Resources and Hydropower Engineering. Vol. 40 (2009), pp.44-50 (in Chinese).
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献